Road Projects
| US-27/441/C-25 Connector s |
$290,635.72 |
| C-470 Widening |
$798,435.97 |
| C-455/N. Buckhill Road and C-455/SR-19 Intersection Improvements |
$ 152,226.00 |
| C-33/48 Widening |
$ 843,028.66 |
| Lake Minneola & Minnehaha Bridge Construction |
$ 2,746,109.50 |
| C-455 Widening (Fosgate to C-561A) |
$ 670,878.52 |
| E. Jack's Lake Road/Northridge Boulevard Extensions |
$ 225,000.00 |
| C-565/565A Widen/Resurface |
$ 133,780.60 |
| C-33 Widen/Resurface |
$ 165,403.05 |
School Projects
| Windy Hill Middle School Construction |
$ 5,934,011.00 |
| Lost Lake Elementary School Construction |
$ 2,455,909.00 |
| Treadway Elementary School Classrooms |
$ 1,642,225.00 |
| Astatula Elementary School Renovation |
$ 1,920,422.00 |
| Umatilla Middle School Renovation |
$ 1,517,324.00 |
Projected Road Projects and their Estimated Costs
| SR 46/Wekiva River Rd. Deceleration Lane |
$ 52,000.00 |
| Widen C-445A to 24' from SR 19 to C-445 |
$ 494,200.00 |
| Widen C-46A to 30' from SR 46 to SR 44 |
$ 975,000.00 |
| Realign and Signalize SR 19/C-42 Intersection |
$ 170,000.00 |
| Widen C-44 to 30' from SR 19 to Hick's Ditch Road |
$ 370,250.00 |
| US 441/C-44B/Donnelly Street Intersection |
$ 613,250.00 |
| C-448 Extension from SR 19 to C-448/C-561 |
$ 469,000.00 |
| C-44C/C-468 Intersection Flashing Beacon and Turn Lanes |
$ 126,924.00 |
| Reconstruct and Signalize E. Main Street/Lake Street Intersection (Leesburg) |
$ 100,000.00 |
| South Dewey Robbins Road Paving |
$ 481,000.00 |
| C-48 from C-33 to Mt. Bethel Baptist Church Road 4 Lane, Tree Lined Median, Sidewalks |
$13,322,000.00 |
Projected School Projects and their Estimated Costs:
| Eustis Elementary Classrooms |
$ 828,215.00 |
| Leesburg High School Ag-Lab |
$ 365,000.00 |
| Mt. Dora High School Art/Music Lab (Partial Fund) |
$ 482,000.00 |
| Skeen Elementary School conversion to 9th grade |
$ 256,514.00 |
| Minneola Elementary School Classroom expansion |
$ 2,120,559.00 |
| Umatilla Elementary School conversion to 9th grade |
$ 400,000.00 |
|
| Current or Future Projects |
|
| No projects planned. |
|
| |
|
For more information about Fire projects,
please contact Public Safety Director / Fire Chief John Jolliff at (352) 343-9458 or jjolliff@lakecountyfl.gov. |
|
| Current or Future Projects |
|
| W.T. Bland Public Library (8 computers) |
$12,000.00 |
| W.T. Bland Public Library Expansion |
$250,000.00 |
| W.T. Bland Public Library: self check out machines, equipment |
$34,440.00 |
| Lady Lake Public Library Expansion & Remodeling |
$900,000.00 |
| Tavares Public Library Expansion |
$40,000.00 |
| Marianne Beck Memorial Library Expansion |
$114,627.00 |
| |
|
| Projects Completed Since 2005 |
|
| Minneola Schoolhouse Library: 3 computers, books, renovation |
$37,077.72 |
| Umatilla Public Library: 1 computer |
$1,018.00 |
| Joint Use Library Project |
$250,000.00 |
| Umatilla Public Library: 1 computer |
$926.00 |
| City of Tavares Public Library: 10 computers, 1 projector |
$14,375.00 |
| Helen Lehmann Memorial Library: 2 computers and desks |
$3,100.32 |
| Cagan Crossings Community Library: computers & furnishings |
$195,758.86 |
| Leesburg Public Library Project |
$500,000.00 |
| Leesburg Public Library: wireless equipment, computers, printers |
$8,628.21 |
| Leesburg Public Library: 25 computers, 1 printer |
$32,773.90 |
| Lake County Library System (all libraries) - Print Management System |
$61,150.00 |
| Citrus Ridge Library Project |
$500,000.00 |
| Joint Use Library Project |
$500,000.00 |
For more information about Library projects,
please contact Tom Merchant at (352) 253-6168 or tmerchant@lakeline.lib.fl.us. |
|
| North Impact Fee District |
EastLLake Community Park
Construction of recreational park with athletic fields, tennis and basketball courts, playgrounds, pavilions, restroom and concession facilities, maintenance building, paved path system and other park amenities. |
|
North Lake Community Park
Phase II - Construction of Little League fields, restroom and concession facility, playgrounds, pavilions, and other park amenities. |
|
| Central Impact Fee District |
Palatlakaha Environmental and Reserve Park
Construction of road network, multi-purpose paved trail, pickle ball, tennis and basketball courts, parking lot, pavilions, picnic tables, benches, signage and other amenities. |
|
| South Impact Fee District |
Ferndale Preserve
Installation of pavilions, playgrounds, canoe launch, fishing pier, boardwalks, observation towers, hiking, equestrian, and paved multi-purpose paved trails, signage, picnic tables, trash receptacles, and other park amenities. |
|
South Lake & Hancock Trail
Installation of asphalt and concrete pavement, concrete curbs, rest areas, signage, pavement markings, trash receptacles, benches and other trail amenities. |
|
| |
|
For more information about Park projects,
please contact Bobby Bonilla at (352) 253-4950 or rbonilla@lakecountyfl.gov. |
|
| Current or Future Projects |
|
| Bible Camp Road (CR565 - SR 19) |
$1,298,000.00 |
| Britt Road (widen and resurgace curves) |
$581,000.00 |
| CR 25A (Dixie Ave.) |
$92,000.00 |
| CR 42 / SR 19 Intersection (realign & signals) |
$1,720,000.00 |
| CR 44 / CR 44 Leg A Intersection (realign & turn lanes) |
$481,000.00 |
| CR 445 from SR 19 to Kismet Road (widen) |
$192,000.00 |
| CR 466 Lady Lake, four lane |
$1,231,000.00 |
| CR 466A Fruitland Park, four lane |
$4,383,000.00 |
| CR 470 Design with FDOT (Turnpike to US 27) |
$761,000.00 |
| CR 473 / Treadway School Road intersection |
$21,000.00 |
| CR 565 (Villa City Road) (widen & resurface) |
$1,287,000.00 |
| CR 565A from SR 50 to Lake Minneola Shores (widen & resurface) |
$1,482,000.00 |
| CR33 PD&E (SR50 to Simon Brown Rd) |
$126,000.00 |
| David Walker/Mt. Homer intersection (signalize with grant funds) |
$44,000.00 |
| Eaglesnest Road (widen & resurface) |
$250,000.00 |
| Hancock Rd, N Extension (CR50 to Fosgate) (construct four lanes) |
$4,112,000.00 |
| Hartwood Marsh Road (construct eastbound left turn lane) |
$298,000.00 |
| Hooks Street phase 4 (construct four lanes) |
$1,850,000.00 |
| Lake Ella Road |
$68,000.00 |
| Lakeshore Blvd. (widen & resurface) |
$565,000.00 |
| Old U.S. 441 (Alfred St.) |
$4,635,000.00 |
| Old U.S. 441 / CR 46 (1st St.) (intersection improvements) |
$528,000.00 |
| Radio Road (Treadway to Jackson) |
$882,000.00 |
| SR 44, participation with FDOT |
$2,000,000.00 |
| Sunset Ave & S. Sunset (widen and resurface) |
$1,105,000.00 |
| Washington / CR 50 |
$211,000.00 |
| |
|
| Recent Projects |
|
| Apshawa Road from Cherry Lake Road to US Hwy 27 |
$650,000.00 |
| Bates Avenue from Eustis City Limits to Estes Road |
$2,750,000.00 |
Bridges Road |
$ 911,245.83 |
| Citrus Tower Blvd. |
$3,150,724.06 |
| Citrus Tower Boulevard at US 27 Intersection with Grand Highway |
$1,685,994.61 |
| Crittenden St. from SR 50/SR 33 to SR 19 |
$2,200,000.00 |
| CR 19A from SR 19/US 441 ramps to Old U.S. 441 |
$650,000.00 |
| CR 25 |
$1,569,357.97 |
| CR 25 Phase 2 |
$218,974.00 |
| CR 25A (Dixie Ave.) from Fruitland St. to Miller St. & from CR 466A - US 441 |
$500,000.00 |
| CR 42 from Marion County to Maggie Jones Road |
$1,350,000.00 |
| CR 44 from CR 473 to Wedgefield Dr. (widen, resurface, & intersections) |
$3,614,000 |
| CR 44 Intersection with Hick's Ditch Road (turn lanes ) |
$550,000.00 |
| CR 44 Intersection with Apiary Road (turn lanes ) |
$75,000.00 |
| CR 44 Intersection with South Fish Camp Road (turn lanes ) |
$75,000.00 |
| CR 44 Intersection with Forest Drive (turn lanes & signals) |
$890,000.00 |
| CR 44 Intersection with Estes Road (turn lanes & signals) |
$977,000.00 |
| CR 44A / Estes Road Intersection (turn lanes & signals) |
$977,000.00 |
| CR 44/CR 44A (signal) |
$57,313.73 |
| CR 46A (preliminary) |
$199,708.48 |
| CR 437 from Orange County to C-44A |
$400,000.00 |
| CR 439 intersection w/ CR 44A |
$26,201.56 |
| CR 445 |
$8,574.00 |
| CR 445A (widening & resurfacing) |
$1,117,961.13 |
| CR 448A/Duda Road Intersection |
$545,737.21 |
| CR 452, Lakeshore |
$115,414.13 |
| CR 455 Extension (Hartle Road) from Hartwood March Road to SR 50 |
$1,085,000.00 |
| CR 466 from Sumter County to US 27/441 & Lemon St. |
$10,000,000.00 |
| CR 466A (Miller St.) from Sumter County to US 27/441 |
$1,250,000.00 |
| CR 470 from Sumter County to CR 33/CR 48 |
$250,000.00 |
| CR 478 (Cherry Lake Road) from SR 19 to E. Apshawa Rd & Jalarmy Road |
$400,000.00 |
| Dewey Robbins Road from US 27 to Turkey Lake Road |
$854,000.00 |
| Dewey Robbins Road / US 27 Intersection |
$305,000.00 |
| Edwards Road from US 27/441 to Gray's Airport Road |
$75,000.00 |
| John's Lake Road/ Hancock Road intersection |
$1,144,217.82 |
| Hancock Road Extension from US 27/Lake Louisa Road to Hartwood March Rd. |
$750,000.00 |
| Hartwood Marsh Road |
$6,255,0000.00 |
| Hooks St. Phase 2 & Citrus Tower Blvd |
$3,912,947.96 |
| Hooks St. Phase 3 |
$1,740,000.00 |
| Huffstetler Drive Phase 2 |
$692,603.00 |
| Kurt St. from US 441 to W. Golflinks Ave. |
$250,000.00 |
| Lake Eustis Dr. / Lakeshore Dr. Intersection |
$30,154.57 |
| Lakeshore Drive |
$238,457.15 |
| Lakshore Drive Bridge |
$50,000.00 |
| Lakeshore Drive / Oswalt / Loghouse Intersection |
$1,300,000.00 |
| Lakeshore Dr./ Harder Road Intersection |
$63,748.28 |
| Lane Park Road / SR 19 Intersection |
$11,106.47 |
| Lone Oak / Main St. Intersection (signals) |
$187,421.68 |
| Max Hooks Road from ST 50 to CR 565A |
$555,000.00 |
| N. Buckhill Road |
$240,247.63 |
| N. Hancock Road Phase 2 |
$2,273,042.00 |
| N. Hancock Road / SR 50 Intersection (signals) |
$115,782.29 |
| Oak Street |
$116,945.34 |
| Oakley Seaver |
$2,344,179.40 |
| Old Mount Dora Road |
$106,667.25 |
| Old U.S. 441(Alfred St.) from SR 19 to Bay Road |
$500,000.00 |
| Old U.S. 441 / Lakeshore Dr. Intersection |
$78,325.81 |
| Radio Road |
$355,147.25 |
| Reverse Frontage Road / Legends Way |
$856,294.74 |
| South Clermont Connector |
$13,777,484.84 |
| South Lake Trail - Phase 1 |
$670,000.00 |
| Turkey Lake Road |
$159,520.99 |
| US 27 / Lake Louisa Intersection |
$94,856.50 |
| Woodlea Road from Lane Park Road to SR 19 |
$5,434,000.00 |
| |
|
For more information about Road projects
please contact Debi Tinis at (352) 483-9002 or dtinis@lakecountyfl.gov. |
|
|