Clay to Pave Road Improvement Projects
The listed clay roads have been grouped together and
are being designed to have the existing clay removed and to construct asphalt
roadways. The final paved roadways will consist of a 10 foot lane, a 2 foot
paved shoulder, and a 6 foot unpaved stabilized grassed shoulder in each direction,
with storm water runoff being handled by roadside swales.
Group
One: South Dewey Robbins Road,
Citrus Valley Road,
Turkey Lake Road
Group
Two:
North Buckhill Road,
Palm Avenue
Group
Three:
South O'Brien Road, Southwest Libby Road, West
Libby Road, Libby Road Number Three
|
|
 |
US 27 and Dewey Robbins Road Intersection
The project will involve the addition of turn lanes on to Dewey Robbins Road from US 27 from both the northbound and southbound side, as well as a dedicated left turn lane from Dewey Robbins Road westbound to US 27. The project is presently scheduled for construction this fiscal year. |
|
 |
CR 42 from Marion County to Maggie Jones Road
This project is an FDOT LAP Agreement to construct paved shoulders on CR 42 from the Marion County line to Maggie Jones Road.The roadway will also be resurfaced. The project is currently programmed for construction in fiscal year 2008.
Construction plans are approaching 70% completion. The rights of way needs are being assessed and additional survey is ongoing. |
|
 |
CR 42 Intersection with SR19
This project will realign and signalize the intersection of CR 42 and SR19. The project is currently programmed for construction in fiscal year 2007. Construction plans are 60% completed. Staff are coordinating with the Florida Department of Transportation (FDOT) for the work that will occur inside the FDOT right of way on SR19. Right of way needs are being assessed and utility relocation coordination is underway.http://www.vhb.com/lakecounty/cr42/ |
|
 |
CR 44 Intersection with Hicks Ditch Road
This project consists of the construction of an eastbound right and westbound
left turn lanes on CR 44 to southbound Hicks Ditch Road. Construction is estimated
to begin in May. http://www.vhb.com/lakecounty/hicksditch/ |
|
 |
CR 44A and Estes Road Intersection
The project will involve resurfacing and widening of the travel lanes to accommodate new turn lanes. In some locations both paved and unpaved shoulders will be added, as well as drainage swales. The project also includes the design of a new traffic signal, and is presently scheduled for construction this fiscal year; however, at the present time, right-of-way issues are causing delays. |
|
|
CR 439 at SR44 Intersection
This project will widen CR439 to include southbound right and left turn lanes.
Construction is estimated to begin in May. |
|
 |
CR 448 Road Improvement
Project
The project will involve resurfacing and widening of the existing travel lanes
from CR 561 east to new fire station 78. The widening will consist of a 12
foot lane, a 3 foot paved shoulder, and a 5 foot unpaved stabilized grassed
shoulder in each direction. A new east bound left turn lane on to Lois Drive
will be added, as well as a widening of the railroad crossing to accommodate
the turn lane. In all locations storm water drainage will be accommodated by
roadside swales. The project is presently scheduled for construction in fiscal
year 2010. |
|
 |
CR 450A Sidewalk
This project will construct a 5’ sidewalk from Church St. to Marshall St.
in Umatilla. Construction of the sidewalk is complete. |
|
 |
CR 455 Howey Curve Road Improvement Project
The project will involve realigning and widening the pavement surface, and adding
storm water management. The project is located approximately 1200 feet east of
the CR 561 and CR 455 Intersection. The realignment will consist of eliminating
the “broken back curves” that exist now and constructing a standard
horizontal curve. Storm water runoff will be handled by a proposed pond to be located
north of the new road alignment, and swales located to the south of the new alignment.
Additionally, catch basins and piping will be used to convey excess storm water
to the pond. The widening will consist of adding both paved and unpaved shoulders.
Specifically, the widening will be a 12 foot lane, a 4 foot paved shoulder,
and a 3 foot unpaved stabilized grassed shoulder in each direction. The project
is presently scheduled for construction in fiscal year 2009. |
|
 |
CR 473 and Treadway School Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes and incorporate new turn lanes as well. In all locations storm water drainage will be accommodated by roadside swales. Specifically, the turn lane configuration will consist of dedicated left turn lanes in all directions, a traffic signal will be added with pedestrian cross walks, and a sidewalk will be added on the southeast side of the project running south of the intersection. The project is presently scheduled for construction in fiscal year 2011. |
|
 |
Bates Ave from Wall St. to Estes Road
This project consists of the widening and resurfacing of the existing road from its current width of 19 feet to 24 feet and constructing a sidewalk on the south side of the road. Construction plans are 90% completed. Utility relocation coordination is currently underway and the rights of way needs are being assessed.
http://www.vhb.com/lakecounty/bates/ |
|
 |
Britt Road
Through its Department of Public Works, the Lake County Board of County Commissioners initiated the design to improve of Britt Road between Wolfbranch Road and SR44 in Mount Dora in 2004. Since the inception, Public Works has progressed with the design and held public meetings seeking input from local residents concerning the proposed improvements. The proposed typical section consists of an urban section with two 12-foot travel lanes, pedestrian facilities, as well as turn lanes at the north and south terminus.The Lake County Board of County Commissioners has provided direction and approved a typical roadway section for the corridor. Phase II of the design has begun with geotechnical and survey services underway to assist in the determination of the location of the potential ponds needed for the stormwater. Additional information concerning the project can be located at the following ftp site and will be updated periodically: ftp://.britt.clients.rsh:road@ftp.rsandh.com |
|
 |
Dewey Robbins Road from US 27 to Turkey Lake Road
This project consists of paving the clay roadway and intersection improvements at US 27. The project is currently programmed for construction in fiscal year 2007. The gopher tortoises relocation efforts have been successful. Construction is underway and is expected to be completed by early July 2008. |
|
|
Diane Dr. and Lisa Dr.
This is a special assessment project that will reconstruct the existing failing
roadways of Diane Dr. and Lisa Dr. Construction plans are complete and the
project is expected to be let for construction in April 2008. |
|
 |
Edwards Road from US27/441 to Grays Airport Road
This project will extend and pave Edwards Road from US27/441 to Grays Airport Road. Rights of way are still being acquired. |
|
| |
Estes Road at Orange Ave. Intersection
This project will add needed turn lanes to each leg of the intersection
and resurface the existing roadway. Although a signal warrant
analysis was performed for this intersection, a traffic signal is not
justified at this time. Construction is estimated to begin in May. http://www.vhb.com/lakecounty/estes/ |
|
| |
Hartwood Marsh Road |
|
 |
Lakeshore Drive and Harder Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes
and incorporate new turn lanes as well. In most locations curb, gutter and drainage
catch basins will be added to accommodate storm water with the storm water routing
to a proposed pond located on the southwest corner of the project. Specifically,
left and right turn lanes will be added to Harder Road, and north and south bound
left turn lanes will be added to Lakeshore Drive. The project also includes the
design of a new traffic signal, and is presently scheduled for construction in
fiscal year 2009. |
|
 |
Lakeshore Drive and Oswalt Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes
and incorporate new turn lanes as well. In most locations curb, gutter and drainage
catch basins will be added to accommodate storm water with the storm water routing
to two proposed pond locations with one on the northeast corner of the intersection,
and the other approximately 800 feet to the northeast on the northwest side of
the road. Specifically, left and right turn lanes will be added to Oswalt Road,
a left turn lane will be added to Log House Road, and north and south bound left
turn lanes will be added to Lakeshore Drive. The project also includes the design
of a new traffic signal, and is presently scheduled for construction in fiscal
year 2009. |
|
 |
Lane Park Cutoff Sidewalk SR19 to CR561
This project will construct a 5’ sidewalk on the south side of Lane Park
Cutoff from SR19 to CR561. Construction is underway and is expected to be complete
early summer of 2008. |
|
 |
Mascotte Empire Road
The project will involve resurfacing and widening from Pearl Street to Mount Pleasant Road of the existing travel lanes, and adding unpaved shoulders and drainage swales. The project is presently scheduled for construction in fiscal year 2009. |
|
 |
Max Hooks Road
This project consists of the widening and resurfacing of the existing facility
from SR50 to CR565A in the Groveland area. The new roadway will consist of two
10 foot lanes and two 2 foot paved shoulders. Construction is estimated to
begin in May. |
|
 |
Old 441 and Lakeshore Drive Intersection Project
The project will involve changes to the Heim Road, Lakeshore Drive, and Oakland
Drive intersections with Old 441. Lakeshore Drive will be converted to a “T” intersection
with the elimination of the cross over northbound at Old 441, and Heim Road will
also be converted to a true “T” intersection with a widening to accommodate
turning traffic off of Old 441. Oakland Drive will be configured as a “right
in and right out” turn configuration off of Old 441 westbound. Essentially,
access to the north will be handled by Heim Road and Oakland Drive, and access
to the south will be handled, as it is now, by Lakeshore Drive. Signalization will
be added at both the Lakeshore Drive and Heim Road intersections with Old 441,
with the Lakeshore Drive location having a pedestrian cross walk. The project will
receive the needed widening and resurfacing from Heim Road to approximately 250
feet east of Oakland Drive along Old 441. The turn lane configuration at
Heim Road will consist of a dedicated left turn lane off of Old 441 and dedicated
left and right turn lanes off of Heim Road. The turn lane configuration at Lakeshore
Road will consist of a dedicated left turn lane off of Old 441, and a dedicated
left and right turn lane off of Lakeshore Drive. The railroad crossing at Lakeshore
Drive will be widened to accommodate the new road design and pedestrian traffic.
Storm water drainage will be handled by multiple items from existing drainage systems
incorporating curb, gutter and catch basins, to added curb and gutter with a small
pond added to the north side of the intersection. The project is scheduled for
right-of-way acquisition in fiscal year 2009. |
|
 |
Old Mount Dora Road US 441 to SR 19
This project consists of the widening, resurfacing and the construction of drainage improvements on Old Mount Dora Road from US 441 to SR19. |
|
| |
Radio Road – Treadway School Road to Jackson Road |
|
| |
Radio Road – US 441 to Treadway Road |
|
 |
Sleepy Hollow Road
This project consists of the realignment of Sleepy Hollow Road to form a “plus
intersection” with US441 and CR 44 in Leesburg. A multiuse trail was also
constructed on the east side of Sleepy Hollow Road. The project is
complete. |
|
 |
Steves Road Phase II
This project will construct a new two lane roadway completing the connection from
US 27 to Citrus Tower Blvd. The developer agreement for construction has been
approved by the Lake County Board of County Commissioners. The project is expected
to be complete in late 2008. |
|
| |