Print Page Email PageSave Link

Click icon for map of project
View Map CR 42 from Marion County to Maggie Jones Road
This project is an FDOT LAP Agreement to construct paved shoulders on CR 42 from the Marion County line to Maggie Jones Road.The roadway will also be resurfaced.  The project is currently programmed for construction in fiscal year 2008. Construction plans are approaching 80% completion. The rights of way needs are being assessed and additional survey is ongoing.

View Map CR 42 Intersection with State Road 19
This project will realign and signalize the intersection of CR 42 and SR 19.  The project is currently programmed for construction in fiscal year 2007. Construction plans are 80% completed. Staff are coordinating with the Florida Department of Transportation (FDOT) for the work that will occur inside the FDOT right of way on SR19. Right of way needs are being assessed and utility relocation coordination is underway.http://www.vhb.com/lakecounty/cr42/

View Map CR 44 Intersection with Hicks Ditch Road
This project consists of the construction of an eastbound right and westbound left turn lanes on CR 44 to southbound Hicks Ditch Road. Construction is complete.  http://www.vhb.com/lakecounty/hicksditch/

View Map CR 44A and Estes Road Intersection
The project will involve resurfacing and widening of the travel lanes to accommodate new turn lanes. In some locations both paved and unpaved shoulders will be added, as well as drainage swales. The project also includes the design of a new traffic signal, and is presently scheduled for construction this fiscal year; however, at the present time, right-of-way issues are causing delays.

CR 439 at SR44 Intersection
This project will widen CR439 to include southbound right and left turn lanes. Construction is complete.


View Map CR 448 Road Improvement Project
The project will involve resurfacing and widening of the existing travel lanes from CR 561 east to new fire station 78. The widening will consist of a 12 foot lane, a 3 foot paved shoulder, and a 5 foot unpaved stabilized grassed shoulder in each direction. A new east bound left turn lane on to Lois Drive will be added, as well as a widening of the railroad crossing to accommodate the turn lane. In all locations storm water drainage will be accommodated by roadside swales. The project is presently scheduled for construction in fiscal year 2012.

View Map CR 450A Sidewalk
This project will construct a 5’ sidewalk from Church St. to Marshall St. in Umatilla. Construction of the sidewalk is complete.

View Map CR 455 Howey Curve Road Improvement Project
The project will involve realigning and widening the pavement surface, and adding storm water management. The project is located approximately 1200 feet east of the CR 561 and CR 455 Intersection. The realignment will consist of eliminating the “broken back curves” that exist now and constructing a standard horizontal curve. Storm water runoff will be handled by a proposed pond to be located north of the new road alignment, and swales located to the south of the new alignment. Additionally, catch basins and piping will be used to convey excess storm water to the pond. The widening will consist of adding both paved and unpaved shoulders. Specifically, the widening will be a 12 foot lane, a  4 foot paved shoulder, and a 3 foot unpaved stabilized grassed shoulder in each direction. The project is presently scheduled for construction in fiscal year 2010.

View Map CR 473 and Treadway School Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes and incorporate new turn lanes as well. In all locations storm water drainage will be accommodated by roadside swales. Specifically, the turn lane configuration will consist of dedicated left turn lanes in all directions, a traffic signal will be added with pedestrian cross walks, and a sidewalk will be added on the southeast side of the project running south of the intersection. The project is presently scheduled for construction in fiscal year 2011.

View Map CR 565/Villa City Road
The project will involve resurfacing and widening from Bible Camp Road to Simon Brown Road of the existing travel lanes, and adding unpaved shoulders and drainage swales.

View Map Bates Ave from Wall St. to Estes Road
This project consists of the widening and resurfacing of the existing road from its current width of 19 feet to 24 feet and constructing a sidewalk on the south side of the road. Construction plans are 90% completed. Utility relocation coordination is currently underway and the rights of way needs are being assessed. http://www.vhb.com/lakecounty/bates/

View Map Britt Road
Through its Department of Public Works, the Lake County Board of County Commissioners initiated the design to improve of Britt Road between Wolfbranch Road and SR44 in Mount Dora in 2004.  Since the inception, Public Works has progressed with the design and held public meetings seeking input from local residents concerning the proposed improvements.  The proposed typical section consists of an urban section with two 12-foot travel lanes, pedestrian facilities, as well as turn lanes at the north and south terminus.The Lake County Board of County Commissioners has provided direction and approved a typical roadway section for the corridor. Phase II of the design has begun with geotechnical and survey services underway to assist in the determination of the location of the potential ponds needed for the stormwater. Additional information concerning the project can be located at the following ftp site and will be updated periodically: ftp://ftp.rsandh.com
Username: Britt
Password: !Br1tt#

View Map Dewey Robbins Road from US 27 to Turkey Lake Road
This project consists of paving the clay roadway and intersection improvements at US 27.  Construction is complete.

Diane Dr. and Lisa Dr.
This is a special assessment project that will reconstruct the existing failing roadways of Diane Dr. and Lisa Dr.  Construction is underway and expected to be complete by early December.


View Map Edwards Road from US27/441 to Grays Airport Road
This project will extend and pave Edwards Road from US27/441 to Grays Airport Road. Rights of way are still being acquired.

 

Estes Road at Orange Ave. Intersection
This project will add needed turn lanes to each leg of the intersection and resurface the existing roadway.  Although a signal warrant analysis was performed for this intersection, a traffic signal is not justified at this time. Construction is complete. http://www.vhb.com/lakecounty/estes/


  Hartwood Marsh Road

View Map Lakeshore Drive and Harder Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes and incorporate new turn lanes as well. In most locations curb, gutter and drainage catch basins will be added to accommodate storm water with the storm water routing to a proposed pond located on the southwest corner of the project. Specifically, left and right turn lanes will be added to Harder Road, and north and south bound left turn lanes will be added to Lakeshore Drive. The project also includes the design of a new traffic signal, and is presently scheduled for construction in fiscal year 2009.

View Map Lakeshore Drive and Oswalt Road Intersection Project
The project will involve resurfacing and widening of the existing travel lanes and incorporate new turn lanes as well. In most locations curb, gutter and drainage catch basins will be added to accommodate storm water with the storm water routing to two proposed pond locations with one on the northeast corner of the intersection, and the other approximately 800 feet to the northeast on the northwest side of the road. Specifically, left and right turn lanes will be added to Oswalt Road, a left turn lane will be added to Log House Road, and north and south bound left turn lanes will be added to Lakeshore Drive. The project also includes the design of a new traffic signal, and is presently scheduled for construction in fiscal year 2009.

View Map

Lane Park Cutoff Sidewalk SR19 to CR561
This project will construct a 5’ sidewalk on the south side of Lane Park Cutoff from SR19 to CR561. Construction is complete.


View Map Mascotte Empire Road
The project will involve resurfacing and widening from Pearl Street to Mount Pleasant Road of the existing travel lanes, and adding unpaved shoulders and drainage swales. The project is presently scheduled for construction in fiscal year 2010.

View Map Max Hooks Road
This project consists of the widening and resurfacing of the existing facility from SR50 to CR565A in the Groveland area. The new roadway will consist of two 10 foot lanes and two 2 foot paved shoulders. This project is complete.

View Map Mt. Pleasant Road
The project will involve resurfacing and widening from Mascotte Empire Road to SR 50 of the existing travel lanes, and adding unpaved shoulders and drainage swales.

View Map Number Two Road
The project will involve pavement resurfacing and widening from CR 48 to SR 19 of the existing travel lanes, and adding unpaved shoulders and drainage swales. The project is presently scheduled for construction in fiscal year 2013.

View Map Old 441 and Lakeshore Drive Intersection Project
The project will involve changes to the Heim Road, Lakeshore Drive, and Oakland Drive intersections with Old 441. Lakeshore Drive will be converted to a “T” intersection with the elimination of the cross over northbound at Old 441, and Heim Road will also be converted to a true “T” intersection with a widening to accommodate turning traffic off of Old 441. Oakland Drive will be configured as a “right in and right out” turn configuration off of Old 441 westbound. Essentially, access to the north will be handled by Heim Road and Oakland Drive, and access to the south will be handled, as it is now, by Lakeshore Drive. Signalization will be added at both the Lakeshore Drive and Heim Road intersections with Old 441, with the Lakeshore Drive location having a pedestrian cross walk. The project will receive the needed widening and resurfacing from Heim Road to approximately 250 feet east of  Oakland Drive along Old 441. The turn lane configuration at Heim Road will consist of a dedicated left turn lane off of Old 441 and dedicated left and right turn lanes off of Heim Road. The turn lane configuration at Lakeshore Road will consist of a dedicated left turn lane off of Old 441, and a dedicated left and right turn lane off of Lakeshore Drive. The railroad crossing at Lakeshore Drive will be widened to accommodate the new road design and pedestrian traffic. Storm water drainage will be handled by multiple items from existing drainage systems incorporating curb, gutter and catch basins, to added curb and gutter with a small pond added to the north side of the intersection. The project is scheduled for construction in fiscal year 2012.

View Map Old Mount Dora Road US 441 to SR 19
This project consists of the widening, resurfacing and the construction of drainage improvements on Old Mount Dora Road from US 441 to SR19.

  Radio Road – Treadway School Road to Jackson Road

  Radio Road – US 441 to Treadway Road

View Map Sleepy Hollow Road
This project consists of the realignment of Sleepy Hollow Road to form a “plus intersection” with US441 and CR 44 in Leesburg. A multiuse trail was also constructed on the east side of Sleepy Hollow Road. The project is complete.

View Map Steves Road Phase II
This project will construct a new two lane roadway completing the connection from US 27 to Citrus Tower Blvd. The developer agreement for construction has been approved by the Lake County Board of County Commissioners. The project is expected to be complete in late 2008.

  Woodlea Road