Below are the fee schedules for services provided by the Department of Public Works.
- Engineering Division
- Funding and Production Division
- Road Operations Division
- Solid Waste Division (see Division's individual fee schedule)
|
|
|
|
|
| Commercial, Industrial, Mining and non-platted Residential |
$925 |
| Major Site Plan Revision/Amendment |
$635 |
| De Minimus Site Plan Revision/Amendment |
$250 |
| Developments of Regional Impact |
$1,500 |
| Resubmittal (beginning with third review) |
$320 |
| Lot Grading Inspection/Commercial |
$200 |
|
|
|
|
|
| No Alternate Data |
$450 |
| Alternate Data (Transportation Impact Study review included) |
$915 |
| Developments of Regional Impact |
$7,500 |
| Transp CEL No Alternative Data Review |
$450 |
| Transp CEL Alternative Data Review |
$915 |
|
|
|
|
|
| Non-residential |
$310 |
| Min Operated Permit |
$160 |
| Residential Minor Subdivision if Infrastructure Construction is involved - 20 lots or less |
$310 |
| Residential Minor Subdivision if Infrastructure Construction is involved - over 20 lots |
$460 |
| Major Plan Revision/Amendment |
$460 |
| De Minimus Plan Revision/Amendment |
$165 |
| SW CEL No Alternate Data Review |
$30 |
| SW CEL Alternate Data Review |
$30 |
|
|
|
|
|
| Construction Plan Review |
|
| Minor Subdivision if Infrastructure Construction is involved - 20 lots or less |
$3,350 |
| Minor Subdivision if Infrastructure Construction is involved - over 20 lots |
$4,390 |
| Resubmittal (beginning with third review) |
$405 |
| Resubmittal (expired projects) |
$130 |
| |
|
| Construction Inspection Fees |
|
| Minor Subdivision if Infrastructure Construction is involved - 20 lots or less |
$2,500 |
| Minor Subdivision if Infrastructure Construction is involved - over 20 lots |
$7,840 |
| Reinspection fee for Final Plat/Project Close-out |
$110 |
| |
|
| Final Plat Review |
$1,115 |
|
|
Back to Top |
| Lot Split |
$165 |
| Lot of Record |
$20 |
| Flood Determination |
$30 |
| Floodplain construction authorization permit |
$80 |
| Letter of Map amendment |
$15 |
| Letter of Map Revision (roads, easements, lots, plats, etc.) |
$20 |
| Lot Grading Review / Inspection(s) |
|
| Commercial |
$200 |
| Single Family |
$75 |
| Multi Family |
$75 |
| Review of Lot Grading Plan |
$35 |
| Traffic Count Request per station (new information) (other organizations) |
$1,390 |
| Right-of-Way Utilization Permit Fee* |
$100 |
* Communication service providers are exempt from the Right-of-Way Utilization Permit fee. |
|
Back to Top |
| Base Fee all other - payable with application |
$2,245 |
| Blanket Platted Drainage & Utility Easement (notification completed by applicant) |
$2,245 |
|
|
Back to Top |
| Residential |
$50 |
| Commercial - Less than 100 ADT |
$320 |
| Commercial - 100 ADT to 1000 ADT |
$390 |
| Commercial - 1,000 ADT or Greater |
$700 |
|
|
Back to Top |
| Unmaintained Roads |
$35 |
| Signs for Municipalities or Other County Agencies |
Materials and Labor Costs |
|
|
Back to Top |
| Maximum charge per job |
$1,500 |
| Clay, material only |
$3.50 per cubic yard |
| Limerock, material only |
$15 per ton |
| Asphalt Cement, material only |
$75 per ton |
| Water Truck |
$65 per hour |
| Grader Time |
$125 per hour |
| Fourteen (14) Yard Dump Truck |
$65 per hour |
| Bulldozer |
$125 per hour |
| Backhoe |
$40 per hour |
| Front End Loader |
$75 per hour |
| Road Mixer |
$90 per hour |
| Roller, Rubber Tired |
$70 per hour |
| Roller, Steel Wheeled / Vibratory |
$70 per hour |
| Gradall |
$110 per hour |
| Bobcat |
$30 per hour |
| A-Boom |
$45 per hour |
| Track Hoe |
$75 per hour |
| Rotary Mower with Tractor |
$35 per hour |
| Pickup Truck, 3/4 ton |
$20 per hour |
| Broom Tractor |
$40 per hour |
| Aerial Lift Truck |
$70 per hour |
| Flatbed Truck |
$50 per hour |
| Pot Hole Asphalt Truck |
$75 per hour |
|
|
Back to Top |
| Single Map - ariel, color |
$12 |
| Single Map - black and white, bond |
$4 |
| Single Map - black and white, vellum |
$5 |
| Township Book |
$30 |
| USGS Quad Maps (pass-through cost, tax included |
$6 plus tax |
| Bid specifications |
$50 |
| CCR's Certified Corner Record |
$10 |
| Copy 1 side (up to 11 x 17) |
$0.15 |
| Copy 2 sides (up to 11 x 17) |
$0.30 |
| Subdivision Plat Index (Alpha) |
$5 |
| Mobile Home Rental Park Street Layout Book |
$9.25 |
| County Maintained Road Index (Alpha) |
$18.54 |
| Traffic Count Map / Data |
$5 |
| Voting Precinct/District Maps |
$5 |
| Master Street Address Guide |
$26 |
| Vision Map (up to 3 feet) |
$5 |
| Vision Map (3 to 6 feet) |
$10 |
| Map information on CD |
$10 |
| |
|
| Mailing Order Charges |
|
| Envelope |
$2 |
| Tube |
$4 |
| Mailing of Tube |
$1.75 |
| Bid specifications |
$4 |
| |
|
|
|
Back to Top |
| Water Sampling Services |
$30 per hour |
| Handling fee for Subcontracted Samples |
$1.50 per batch |
| |
|
| Water Resources Analysis Tests |
|
| Sampling Services (labor, travel time, gas) |
$32 per hour |
| Handling Fee (subcontracted samples) |
$1.50 per batch |
| Miscellaneous Lab Results Review fee |
$35 |
| Hydogeologist Fee |
$50 per hour |
| |
|
| Alkalinity |
$9 |
| Chloride |
$9 |
| Hardness |
$13.50 |
| TDS (Total Dissolved Solids) |
$12 |
| TSS (Total Suspended Solids) |
$10.50 |
| Total Residual Chlorine |
$10 |
| Turbidity, Lab |
$8 |
| Chromogenic Substrate (Drinking water micro) |
$10 |
| Total Coli MF |
$13 |
| Fecal Coli MF |
$13 |
| CBOD |
$22 |
| BOD |
$21 |
| TOC (Total Organic Carbon) |
$15 |
| Auto NH3-N (Ammonia Nitrogen) |
$11 |
| Auto NOx-N |
$11 |
| Auto NO2-N |
$9 |
| NO3-N (includes NO2-N & Nox-N) |
$17 |
| Auto TKN (Toal Kjeldahl Nitrogen) |
$15 |
| Auto Total Phosphorous |
$14 |
| Auto Ortho Phosphorous |
$9 |
| Calcium |
$10 |
| Magnesium |
$10 |
| Sodium |
$10 |
| Potassium |
$10 |
| Trace Metals |
$10 |
| Sulfate |
$10 |
| Surfactants - MBAS |
$30 |
| pH |
$6 |
| Organic Nitrogen |
$25 |
| Total Solids |
$12 |
| Specific Conductance |
$6 |
| Dissolved Oxygen |
$5 |
| Color |
$5 |
| Chlorophyll a |
$30 |
|
|
Back to Top |
| Herbicide Treatments for Municipalities and Other Government Agencies |
$35 |
|
| Above fees effective as of 10/1/2010 |
|