Facebook Link Preview for LakeCountyFL.gov
Lake County logo
Residents Visitors Business Government
 
You are here: Home > Departments > Public Works > Engineering > Completed Studies
 
 Completed Studies
Print Page Save Link

Below are documents related to completed studies that the Lake County Public Works Department Engineering Division has finished. While we have tried to make the file size as small as possible, some of the files are very large. You can request to have the studies on CD-ROM by calling the Engineering Division at (352) 483-9040.

Rights-of-Way ADA Transitional Plan
Rights-of-Way ADA Transitional Plan Document
Rights-of-Way ADA Transitional Plan Public Info Meeting Presentation

Wekiva Parkway
Project Development & Environment (PD&E) Study

Wekiva Trail
Wekiva Trail Feasibility Study (FTP Download - 100 MB)

Cherry Lake Road

County Road 19A

County Road 33

County Road 455 (Hartle Road) Extension

County Road 455 Montverde Corridor

County Road 44 Corridor Transportation Study

County Road 466 Project Development and Environment Study

County Road 466A (Miller Street)

County Road 470

County Road 561

County Road 561A

Crittenden Street

East Revels Road and South Lakeshore Blvd (Howey-in-the-Hills)

Gardenia Trail - Phases II & III
Final PD&E Study Documents available via FTP download

Hartwood Marsh Road

Kurt Street, Eustis

Lakeshore Drive Bridge, Clermont

Minneola Ridge Traffic Study

Minneola Collector Road

North Hancock Road Traffic Corridor Safety Study

Old US 441 - Alfred Street Corridor

Old US 441 - Bay St. to McDonald

Picciola Bridge

Rolling Acres Road

South Hancock Road

FTP File Download Site
Below are the files that are available from File Download site.

  • Study Location Map (95 KB)
  • Hancock Road 100% Plans (45 MB)
  • Final Preliminary Engineering Report - June 2006 (13 MB)

South Lake Trail - Phases III & IV

State Road 19

State Road 50

Sunset Avenue

Wellness Way

FTP File Download Site
Below are the files on the FTP File Download space.

  • Wellness Way PD&E Study (33.7 MB)
  • Preliminary Environmental Impact Report (12.01 MB)
  • Preliminary Engineering Report (20 MB)
  • Wellness Way Design Traffic Report (7.7 MB)
  • Wellness Way Phase I Cultural Resource Assessment Survey (5.5 MB)
  • Various Appendices for Reports

Woodlea Road

 
Lake County BCC Copyright 2006
Home : Visitors : Residents : Business : Government : Directory of Services : Online Services